Case Study: The Berkeley Hotel
Client: The Berkeley Hotel London
|
An onsite fabrication plant was setup to facilitate the programme and the difficult nature of the project; bespoke sections of sheet metal ductwork were fabricated on site to prevent unnecessary delays between site and workshop. The project was phased around multiple mini programmes to help the hotel over come the problem of having large numbers of rooms off line at any given time. On completion of each phase, the batches of rooms were handed over with the air conditioning systems running; the hotel guests could therefore benefit immediately from the newly air conditioned bedrooms. Existing redundant services were removed and live existing services (fire alarm sensors and sounders, lighting, ventilation plant) were repositioned and upgraded as part of the installation The ResultThe guests in this five star hotel in central London now benefit from the comfort and control of a new Daikin VRV air conditioning system. |