
Case Study: The Radisson Hotel Manchester Airport
Client: Radisson Hotel Manchester
|
The SolutionA high efficiency Rhoss 890kW high efficiency chiller was installed as a replacement for the existing apparatus and connected to the existing pipe work. Alterations were made to the existing power supply to accommodate the new chiller. The existing system was flow balanced to accommodate lower pressure drops in the high efficiency chiller. The ResultThe hotel has a new high efficiency Rhoss chiller which provides chilled water at extremely economical rates to the hotels bedrooms and public areas. |




