Sales Enquiry
Fill out the form below to enquire about how we can help with your next project
We aim to respond as soon as possible, with a follow up email or phonecall.
+44 (0) 28 3752 6090
info@cross-group.org
Discuss a project
Cross Ripening were engaged by Compagnie Fruitière UK to deliver a new, state of the art banana ripening depot in Wigan.
This was to include 31 x 48 pallet 3-Tier banana rooms including intake, dispatch and packing areas.
This facility was built to replace their existing depot in Bolton, enhancing their capability as a business through cutting edge banana ripening technology.
This new facility was delivered with environmentally friendly Ammonia NH3 water chillers with evaporative condensers to provide chilled water cooling to the banana rooms.
This project was a complete turnkey package, with Cross Ripening providing all insulated panels, doors, refrigeration, electrical distribution, power factor correction, fire detection, concrete kerbing, MHE charging areas, door protection and LED lighting.
Fill out the form below to enquire about how we can help with your next project
We aim to respond as soon as possible, with a follow up email or phonecall.